亚洲城ca88唯一官网

更多
首页 -- 亚洲城ca88唯一官网安装施工事项 -- 亚洲城ca88唯一官网如何施工
亚洲城ca88唯一官网如何施工

  亚洲城ca88唯一官网分为设临时亚洲城ca88唯一官网和永久亚洲城ca88唯一官网 ,当地基压缩性不高,沉降值差异不大,且沉降完成较快时,补齐预留的施工后浇带后,连成整体的结构完全可以承受剩余沉降差产生的结构内力,可以设置临时亚洲城ca88唯一官网,即所谓的施工后浇带。
Deformation joints are divided into temporary deformation cracks and permanent deformation joints, compressibility is not high, when the foundation settlement value difference, and the settlement done faster, swallow the reserved after pouring belt in the construction, into the overall structure can withstand the settlement difference between the remaining structure internal force, can set up temporary deformation cracks, the so-called after construction of the pouring belt.
  当地基持力层压缩性高,且厚度较大,就要设永久亚洲城ca88唯一官网,使高层与裙房彻底脱开,防止各自沉降对整体结构变形产生较大的影响。
When foundation bearing layer compressibility is high, and the thickness is bigger, will be permanent deformation cracks, the top and skirt room completely release, settlement of their larger influence on the structure deformation.
  具体的施工工艺简洁来说就是:在正常施工过程中在支完柱模以后,支亚洲城ca88唯一官网的模板,然后校正,然后缝顶封盖,最后检查验收一下,基本就这个步骤。
Concrete construction technology is simple: in normal after construction process in the mould, the deformation of the template, then correction, then sew the top block, final inspection acceptance, basic on the steps.